
Magnacoustics Inc™ © 2012 1-800-637-2282 REV-S 16 |
Genesis ULTRA Installation and Connections - continued
26: Leave approximately 12” of cable “CB2” protruding from the front center of the MRI
directly above the table docking mechanism for a service loop, or alongside the base of the
gantry. It is important to locate the end of “CB2” as close as possible to the front center of
the bore.
27: For all MRI’s it is very important to locate the Transducer as close as possible to the
front center of the bore. For all GE MRI’s locate the Transducer either side of the
pedestal above the Up / Down height control peddles as pictured below. Connect cable
“CB2” to the Transducer.
28: There are 4 very sensitive pressure actuated switches for the patient controls located in the
Transducer. During shipping sometimes pressure or vacuums can build in the controls
causing erroneous operation of the patient volume and mode selection buttons.
Therefore it is good practice to let the Controls and Transducer become acclimated to the
scan room environment for a few hours or until the temperature stabilizes then;
a. Vent the patient controls to the atmosphere by momentarily removing the white tubing
one pair at a time and reconnecting them to the nipples on the Transducer observing
polarity for proper synchronization.
29: Insure that the Gradient noise sensing Mic is connected to the BNC connection on the side
of Transducer. Place the Mic anywhere in the general area. Secure with the provided
mounting pad and zip tie.
30: Connect the clear Siamese Headset tubing to the brass tubes protruding from the top of
Transducer. Do not add any additional tubing length to this system, doing so will
adversely affect performance and reliability.
31: Connect the Headset to Siamese tubing.
Power Connection Caution:
1. Please ensure that all low voltage connections are complete before connecting the AC
power cords.
2. Please do not make or break any connections to our equipment while the AC plugs are
live / connected to power or damage will result!!
3. To preserve RF integrity in the scan room we float our ground from the penetration panel.
4. Please ensure that the module and stereo AC plugs are connected to outlets that are at
the same Ground Potential as the Scanner or Damage to our Equipment and or poor
SNR performance will result!!
Komentarze do niniejszej Instrukcji